In the Summer of 2016, heavy-lift installation vessel Svanen carried out its first job under the Van Oord flag.

In 2017 the vessel is modified. The adjustments included the installation of two spreader beams at the main hoists to hoist 2,000 tonnes each, a new skidding gripper, suitable for monopiles with a length up to 90 metres and diameters between 7 and 11 meters (bottom part), the gripper can be equipped with a Noise Mitigation System and is complemented with a skidding hammer platform for hammers with a maximum weight of 1,200 tonnes.